Advanced search  

News:

CPG Release 1.6.26
Correct PHP8.2 issues with user and language managers.
Additional fixes for PHP 8.2
Correct PHP8 error with SMF 2.0 bridge.
Correct IPTC supplimental category parsing.
Download and info HERE

Pages: [1]   Go Down

Author Topic: P.O.T. Day/Week settings  (Read 1674 times)

0 Members and 1 Guest are viewing this topic.

rhaman07

  • Coppermine newbie
  • Offline Offline
  • Posts: 1
P.O.T. Day/Week settings
« on: November 24, 2007, 02:23:01 pm »

I'm a new user to Coppermine so please bear with me.  I've been looking for information on the pot day/week check boxes, more to the point, trying to figure out how to move one of my gallery images to the "Feature Photo" on my home page.  I did this by accident after my designer first set up the site and can't for the life of me figure out how.

Stumbling around the Coppermine site Ive either overlooked this explanation or not looked in the correct place. 
Logged
Pages: [1]   Go Up
 

Page created in 0.015 seconds with 20 queries.